Your SEO optimized title page contents
Showing posts with label engine. Show all posts
Showing posts with label engine. Show all posts

Wednesday, 26 October 2011

Fuel -B737

Fuel Panels

737-1/200 Fuel Panel 737-Classic 4-Tank Fuel Panel NG Fuel Panel
The maximum declarable fuel capacity for tech log, nav log, etc is 16,200kgs for 3-Tank Classics, 20,800kgs for NG’s and up to 37,712kgs for BBJ’s depending upon how many tanks the customer has specified (max 12). The AFM limits are higher, but not normally achievable with standard SG’s. The fuel panels for the various series have not changed much over the years. The NG’s have separate ENG VALVE CLOSED & SPAR VALVE CLOSED lights in place of FUEL VALVE CLOSED. The -1/200 panel also has blue VALVE OPEN lights similar to that on the crossfeed valve. The FILTER BYPASS lights were FILTER ICING on the 1/200.
The 1/200′s had heater switches; these used bleed air to heat the fuel and de-ice the fuel filter. They were solenoid held and automatically moved back to OFF after one minute.
NG: The engine spar valves and APU are normally powered by the hot battery bus but have a dedicated battery to ensure that there is always power to shut off the fuel in an emergency.

Fuel Gauges

Analogue Fuel Gauges -1/200′s and some older -300′s
 
Digital Sunburst Fuel Gauges – Simmonds 4 Tank
- 3/4/500′s
Digital Sunburst Fuel Gauges – Smiths
- 3/4/500′s

Fuel Gauge Accuracy

The 737 fuel quantity indication system has the following accuracy tolerances:
737-100/-200:
FQIS accuracy: +/- 3.0%
737-300/-400/-500,
FQIS accuracy with digital indicators: +/- 2.5 %
FQIS accuracy with analog indicators: +/- 3.0%
The total tolerance for the FQIS system is based on a full tank. For example, if the fuel tank maximum capacity is 10,000 KG, then the tolerance of the gauging is 0.03 (airplane with analog indicators) * 10000 = 300 KG. The system tolerance is then +/- 300 KG at any fuel level within the tank.
The accuracy of the fuel flow transmitter is a function of the fuel flow. At engine idle, the system tolerance can be 12%. During cruise, the tolerance is less than 1.5%. The fuel flow indication is integrated over time to calculate the fuel used for each engine.
737-600/-700/-800/-900 with densitometer:
FQIS accuracy: +/- 1.0% overall
Main tanks > 50%, -1 to 5 deg pitch, +/- 1 deg roll: +/- 1.5%
Main tanks < 50%, -1 to 5 deg pitch, +/- 1 deg roll: +/- 1.0%
737-600/-700/-800/-900 without densitometer:
FQIS accuracy: +/- 2.0% overall
Main tanks > 50%, -1 to 5 deg pitch, +/- 1 deg roll: +/- 2.5%
Main tanks < 50%, -1 to 5 deg pitch, +/- 1 deg roll: +/- 2.0
The total tolerance for the FQIS system is based on a full tank. For example, if the fuel tank maximum capacity is 10,000 KG, then the tolerance of the gauging is 0.02 (airplane without a densitometer) * 10000 = 200 KG. The system tolerance is then +/- 200 KG at any fuel level within the tank.
The accuracy tolerance of the fuel flow transmitter is a function of the fuel flow. At engine idle, the system tolerance can be 12%. During cruise, the tolerance is less than 0.5%. The fuel flow indication is integrated over time to calculate the fuel used for each engine.
On the Digital Sunburst fuel gauges, pressing the “Qty test” button will start a self test of the display and the fuel quantity indicating system. After the test, each gauge will display any error codes that they may have.
Note: The gauges are still considered to be operating normally with error codes 1, 3, 5 or 7 on the Simmonds gauges or error codes 1,3 and 6 on the Smiths gauges. ie If the gauge is indicating (rather than zero) the gauge may be used.
 DU Fuel Gauges -NG’s
 
Low fuel quantity indication illuminates below either 907 or 453kg
- NG’s
NG fuel gauges can give messages such as LOW, CONFIG or IMBAL
  Digital Fuel Quantity Indicator Error Codes – Simmonds
Error Code Fuel Quantity Indicator Reading Probable Cause Gauges considered to be operating normally?
0 Zero Missing or disconnected tank unit
1 Normal Tank contamination Yes
2 Zero Bad HI-Z lead
3 Normal Bad compensator unit wiring Yes
4 Zero Bad tank unit wiring
5 Normal Bad compensator unit Yes
6 Zero Bad tank unit
7 Normal Contamination/water in compensator Yes
8 Zero Bad fuel quantity indicator
9 Normal or zero Improperly calibrated indicator

Blank Bad fuel quantity indicator
Digital Fuel Quantity Indicator Error Codes – Smiths
Error Code Fuel Quantity Indicator Reading Probable Cause Gauges considered to be operating normally?
1 Normal Open or short in compensator LO-Z wiring Yes
2 Zero Short circuit in compensator unit
3 Normal Too much leakage in compensator unit Yes
4 Zero Open or short circuit in a LO-Z to a tank unit
5 Zero Short circuit in a tank unit
6 Normal Too much leakage in tank unit Yes
7 Zero (or ERR in flight) Calibration unit does not operate correctly
8 Blank An error in the DCTU data
9 Zero (or ERR in flight) A problem with the indicator memory
  10 Zero Open or short circuit in the HI-Z line
Dripsticks If a fuel gauge is u/s the quantity must be determined by using the dripsticks (floatsticks in later aircraft). The classics have 5 dripsticks in each wing tank and none in the centre tank. The NG has 6 dripsticks in each wing tank and 4 in the centre tank. Because of cumulative errors it is recommended that the wings are filled once every few sectors to ensure an even fuel balance. In-flight, the GW must be periodically updated to ensure the accuracy of VNAV speeds, buffet margin and max altitude.
Fuel quantity is measured by using a series of capacitors in the tanks with fuel acting as the dielectric. Calibration of the fuel gauges is done by capacitance trimmers, these are adjusted to standardise the total tank capacitance and allows for the replacement of gauges. On older aircraft the trimmers were accessible from the flightdeck (below the F/O’s FMC) but they have since been removed to a safer place! Capacitance trimmers

Pumps

There are two AC powered fuel pumps in each tank; there are also EDP’s at each engine. Both fuel pump low pressure lights in any tank are required to illuminate the master caution to avoid spurious warnings at high AoA’s or accelerations. Centre tank LP lights are armed only when their pumps are ON.
Leaving a fuel pump on with a low pressure light illuminated is not only an explosion risk (see Thai and Philippine write offs) but also if a pump is left running dry for over approx 10 minutes it will lose all the fuel required for priming which will render it inoperative even when the tank is refuelled. If you switch on the centre tank pumps and the LP lights remain illuminated for more than 19 seconds then this is probably what has happened. The pumps should be switched off and considered inop until they can be re-primed.

On the 1-500′s, the centre tank pumps are located in a dry area of the wing root but on the NG’s the pumps are actually inside the fuel tank (see photo below). This is why only the NG’s are affected by AD 2002-19-52 which requires the crew to maintain certain minimum fuel levels in the center fuel tanks. You can see the location of the centre tank pumps on the forward wall of the wheel well on the NG’s, since the forward wall is actually the back of the centre fuel tank.
Note: for aircraft delivered after May 2004, centre tank fuel pumps will automatically shut off when they detect a low output pressure.
Right centre tank fuel pump on the forward wall of the wheel well – NG’s only
Centre Tank Scavange Pumps
These transfer fuel from the centre tank into tank 1 at a minimum rate of 100kg/hr, although usually nearer 200kg/hr. The trigger for the scavenge pump is different for the series as follows:
  • Originals: Only fitted after l/n 990 (Dec 1983). Operates the same as the classics.
  • Classics: Switching both centre tank pumps OFF will cause the centre tank scavenge pump to transfer centre tank fuel into tank 1 for 20 minutes.
  • NG’s: The centre tank scavenge pump starts automatically when main tank 1 is half full and its FWD pump is operating. Once started, it will continue for the remainder of the flight.
NB On the classics, when departing with less than 1,000kg of fuel in the centre tank, an imbalance may occur during the climb. This is because the RH centre tank pump will stop feeding due to the body angle so number 2 engine fuel is drawn from main tank 2, while engine 1 is still drawing fuel from the centre tank. When this “runs dry” the scavenge pump will also transfer any remaining centre tank fuel into main tank 1, thereby exacerbating the imbalance.
The APU uses fuel from the number 1 tank. If AC power is available, select the No 1 tank pumps ON for APU operation to assist the fuel control unit, especially during start. Newer –500 series aircraft have an extra, DC operated APU fuel pump in the No 1 tank which operates automatically during the start sequence. The APU burns about 160Kgs/hr with electrics and an air-conditioning pack on and this should be considered in the fuel calculations if expecting a long turnaround or waiting with pax on board for a late slot.

Fuel Temperature
Limitations: Max fuel temp +49ºC, Min fuel temp -45ºC or freezing point +3ºC, whichever is higher. Typical freezing point of Jet A1 is -47ºC. If the fuel temp is approaching the lower limits you could descend into warmer air or accelerate to increase the kinetic heating. Fuel temp is taken from main tank 1 because this will be the coldest as it has less heating from the smaller hydraulic system A.
A fuel sampling and testing kit is kept on the flight deck of all aircraft to test for water.
The NG series are prone to “Upper Wing Surface Non-environmental Icing” or “Cold Soaked Fuel Frost” CSFF. This is due to cold soaked fuel causing frost to form on the wings during the turnarounds – even in warm conditions! From July 2004 NGs have been delivered with markings on the upper surface of the wings where this frost is allowable for despatch under the following conditions:
Takeoff with CSFF on the upper wing surfaces is permissible, provided the following are met:
  • the frost on the upper surface is less than 1/16 inch (1.5 mm) thick
  • the extent of the frost is similar on both wings
  • the frost is on or between the black lines defining the permissible CSFF area
  • the outside air temperature is above freezing(0 C, 32 F)
  • there is no precipitation or visible moisture at the wing surface (rain, drizzle, snow, fog)


Auxiliary Fuel System

The standard number of fuel tanks is three. Classics could be fitted with an auxiliary fourth tank which was controlled from the main panel as shown at the top of the page. The 737-200Adv could also be fitted with an auxiliary tank at the forward end of the aft hold; these were available in either 3,065 or 1,421 litre capacities.
BBJ Aux fuel panel located on Capt’s & F/O’s main panels
The BBJ can have up to 9 aux fuel tanks giving it a maximum fuel quantity of 37,712kgs (83,000lbs) although in practice this would probably take you over MTOW if any payload was carried. This fuel would give a theoretical range in excess of 6200nm. The aux tanks are located at the rear of the fwd hold and the front of the aft hold, this reduces the C of G movement as fuel is loaded and used.

Aux fuel tank in aft hold of a BBJ2 (-800 fuselage)
Refuelling of the aux tanks is done by moving the guarded switch in the refuelling panel to AUX TANKS. The controls for main tanks 1 and 2 change to aft aux (AA) and fwd aux (FA) respectively.
The aux fuel system is essentially automatic. It works by transferring fuel from the aux tanks into the centre tank where it is then fed to the engines in the normal way. Flight crew can select fwd or aft tanks but normal practice is to use both to maintain C of G balance. The fwd and aft tanks are switched off when the ALERT light illuminates on the main panel.
Aux fuel control panel (Overhead panel)
There are no pumps in the aux fuel system. Cabin differential pressure (and bleed air as a backup) is used to maintain a head of pressure in the aux tanks to push the aux fuel into the centre tank.
Aux fuel control panel (Aft overhead panel)
(All Aux fuel photos: Capt D Britchford)

Ferry Tank
The 737-200 had provision for a ferry kit. This comprised a 2,000 US Gal (7,570 litre) bladder cell which attached to the seat tracks of the passenger cabin. The fuel was fed to the centre tank through a manual valve by cabin pressure.

To date, two 737′s, 737-400 HS-TDC of Thai Airways on 3 Mar 2001 and 737-300 EI-BZG operated by Philippine Airlines on 5 Nov 1990 have been destroyed on the ground due to explosions in the empty centre fuel tank. The common factor in both accidents was that the centre tank fuel pumps were running in high ambient temperatures with empty or almost empty centre fuel tanks.
Even an empty tank has some unusable fuel which in hot conditions will evaporate and create an explosive mixture with the oxygen in the air. These incidents, and 15 more on other types since 1959, caused the FAA to issue SFAR88 in June 2001 which mandates improvements to the design and maintenance of fuel tanks to reduce the chances of such explosions in the future. These improvements include the redesign of fuel pumps, FQIS, any wiring in tanks, proximity to hot air-conditioning or pneumatic systems, etc.
737s delivered since May 2004 have had centre tank fuel pumps which automatically shut off when they detect a low output pressure and there have been many other improvements to wiring and FQIS. But the biggest improvement will be centre fuel tank inerting. This is universally considered to be the safest way forward, but is very expensive and possibly impractical. The NTSB recommended many years ago to the FAA that a fuel tank inerting system be made mandatory, but the FAA have repeatedly rejected it on cost grounds.
Boeing has developed a Nitrogen Generating System (NGS) which decreases the flammability exposure of the center wing tank to a level equivalent to or less than the main wing tanks. The NGS is an onboard inert gas system that uses an air separation module (ASM) to separate oxygen and nitrogen from the air. After the two components of the air are separated, the nitrogenenriched air (NEA) is supplied to the center wing tank and the oxygenenriched air (OEA) is vented overboard. NEA is produced in sufficient quantities, during most conditions, to decrease the oxygen content to a level where the air volume (ullage) will not support combustion. The FAA Technical Center has determined that an oxygen level of 12% is sufficient to prevent ignition, this is achievable with one module on the 737 but will require up to six on the 747.
On 21 Feb 2006 the Honeywell NGS was certified by the FAA after over 1000hrs flight testing on two 737-NGs. Aircraft from l/n 1935 (Aug 2006) to 2006 were delivered with basic provisions for NGS and more comprehensive provisioning up to l/n 2019. Full production cutover is scheduled for l/n 2620 onwards. The NGS requires no flight or ground crew action for normal system operation and is not dispatch critical.
NGS Panel in the wheel-well
Photo: Lonnie Ganz
This from the FAA Systems Fire Group website:
B-737 Ground / Flight Testing
A series of aircraft flight and ground tests were performed by the Federal Aviation Administration and the Boeing Company to evaluate the effectiveness of ground-based inerting (GBI) as a means of reducing the flammability of fuel tanks in the commercial transport fleet. Boeing made available a Boeing 737 for modification and testing. A nitrogen-enriched air (NEA) distribution manifold, designed, built, and installed by Boeing, allowed for deposit of the ground-based NEA into the center wing tank (CWT). The fuel tank was instrumented with gas sample tubing and thermocouples to allow for a measurement of fuel tank inerting and heating during the testing. The FAA developed an in-flight gas sampling system, integrated with eight oxygen analyzers, to continuously monitor the ullage oxygen concentration at eight different locations. Other data such as fuel load, air speed, altitude, and similar flight parameters were made available from the aircraft data bus. A series of ten tests were performed (five flight, five ground) under different ground and flight conditions to demonstrate the ability of GBI to reduce fuel tank flammability. It was demonstrated under the most hazardous condition-an empty center wing tank-that GBI would remain effective for a large portion of the flight, or until aircraft descent. However, it was also shown that the dual venting configuration of some Boeing airplanes would have to be modified to prevent loss of inerting at certain ground and flight cross flow conditions.
Download the Final Report (DOT/FAA/AR-01/63)  (4.8Mb)

Limitations
Max temp +49°C
Min temp -43°C or freeze pt +3°C
Max quantity 1/200: 4300 + 4100 + 4300 = 12,700kg  (2 bag ctr bays)

200Adv: 4300 + 5400 + 4300 = 14,000kg  (3 bag ctr bays)

200Adv: 4300 + 7000 + 4300 = 15,600kg  (3 bag integral)

3/4/500: 4600 + 7000 + 4600 = 16,200kg

NG’s:    3900 + 13000 + 3900 = 20,800kg
Max lateral imbalance 1/200: 680kg; All other series: 453kg
Main tanks to be full if centre contains over 453kg
For ground operation, centre tank pumps must be not be positioned to ON, unless defuelling or transferring fuel, if quantity is below 453kgs.
Centre tank pumps must be switched OFF when both LP lights illuminate.
Centre tank pumps must not be left ON unless personnel are available in the flight deck to monitor LP lights.
Centre tank pumps should not be allowed to run dry or be left running unsupervised. Crew reset of fuel pump circuit breakers in-flight is prohibited (QRH CI.2.2)

Fuel Panels

737-1/200 Fuel Panel 737-Classic 4-Tank Fuel Panel NG Fuel Panel
The maximum declarable fuel capacity for tech log, nav log, etc is 16,200kgs for 3-Tank Classics, 20,800kgs for NG’s and up to 37,712kgs for BBJ’s depending upon how many tanks the customer has specified (max 12). The AFM limits are higher, but not normally achievable with standard SG’s. The fuel panels for the various series have not changed much over the years. The NG’s have separate ENG VALVE CLOSED & SPAR VALVE CLOSED lights in place of FUEL VALVE CLOSED. The -1/200 panel also has blue VALVE OPEN lights similar to that on the crossfeed valve. The FILTER BYPASS lights were FILTER ICING on the 1/200.
The 1/200′s had heater switches; these used bleed air to heat the fuel and de-ice the fuel filter. They were solenoid held and automatically moved back to OFF after one minute.
NG: The engine spar valves and APU are normally powered by the hot battery bus but have a dedicated battery to ensure that there is always power to shut off the fuel in an emergency.

Fuel Gauges

Analogue Fuel Gauges -1/200′s and some older -300′s
 
Digital Sunburst Fuel Gauges – Simmonds 4 Tank
- 3/4/500′s
Digital Sunburst Fuel Gauges – Smiths
- 3/4/500′s

Fuel Gauge Accuracy

The 737 fuel quantity indication system has the following accuracy tolerances:
737-100/-200:
FQIS accuracy: +/- 3.0%
737-300/-400/-500,
FQIS accuracy with digital indicators: +/- 2.5 %
FQIS accuracy with analog indicators: +/- 3.0%
The total tolerance for the FQIS system is based on a full tank. For example, if the fuel tank maximum capacity is 10,000 KG, then the tolerance of the gauging is 0.03 (airplane with analog indicators) * 10000 = 300 KG. The system tolerance is then +/- 300 KG at any fuel level within the tank.
The accuracy of the fuel flow transmitter is a function of the fuel flow. At engine idle, the system tolerance can be 12%. During cruise, the tolerance is less than 1.5%. The fuel flow indication is integrated over time to calculate the fuel used for each engine.
737-600/-700/-800/-900 with densitometer:
FQIS accuracy: +/- 1.0% overall
Main tanks > 50%, -1 to 5 deg pitch, +/- 1 deg roll: +/- 1.5%
Main tanks < 50%, -1 to 5 deg pitch, +/- 1 deg roll: +/- 1.0%
737-600/-700/-800/-900 without densitometer:
FQIS accuracy: +/- 2.0% overall
Main tanks > 50%, -1 to 5 deg pitch, +/- 1 deg roll: +/- 2.5%
Main tanks < 50%, -1 to 5 deg pitch, +/- 1 deg roll: +/- 2.0
The total tolerance for the FQIS system is based on a full tank. For example, if the fuel tank maximum capacity is 10,000 KG, then the tolerance of the gauging is 0.02 (airplane without a densitometer) * 10000 = 200 KG. The system tolerance is then +/- 200 KG at any fuel level within the tank.
The accuracy tolerance of the fuel flow transmitter is a function of the fuel flow. At engine idle, the system tolerance can be 12%. During cruise, the tolerance is less than 0.5%. The fuel flow indication is integrated over time to calculate the fuel used for each engine.
On the Digital Sunburst fuel gauges, pressing the “Qty test” button will start a self test of the display and the fuel quantity indicating system. After the test, each gauge will display any error codes that they may have.
Note: The gauges are still considered to be operating normally with error codes 1, 3, 5 or 7 on the Simmonds gauges or error codes 1,3 and 6 on the Smiths gauges. ie If the gauge is indicating (rather than zero) the gauge may be used.
 DU Fuel Gauges -NG’s
 
Low fuel quantity indication illuminates below either 907 or 453kg
- NG’s
NG fuel gauges can give messages such as LOW, CONFIG or IMBAL
  Digital Fuel Quantity Indicator Error Codes – Simmonds
Error Code Fuel Quantity Indicator Reading Probable Cause Gauges considered to be operating normally?
0 Zero Missing or disconnected tank unit
1 Normal Tank contamination Yes
2 Zero Bad HI-Z lead
3 Normal Bad compensator unit wiring Yes
4 Zero Bad tank unit wiring
5 Normal Bad compensator unit Yes
6 Zero Bad tank unit
7 Normal Contamination/water in compensator Yes
8 Zero Bad fuel quantity indicator
9 Normal or zero Improperly calibrated indicator

Blank Bad fuel quantity indicator
Digital Fuel Quantity Indicator Error Codes – Smiths
Error Code Fuel Quantity Indicator Reading Probable Cause Gauges considered to be operating normally?
1 Normal Open or short in compensator LO-Z wiring Yes
2 Zero Short circuit in compensator unit
3 Normal Too much leakage in compensator unit Yes
4 Zero Open or short circuit in a LO-Z to a tank unit
5 Zero Short circuit in a tank unit
6 Normal Too much leakage in tank unit Yes
7 Zero (or ERR in flight) Calibration unit does not operate correctly
8 Blank An error in the DCTU data
9 Zero (or ERR in flight) A problem with the indicator memory
  10 Zero Open or short circuit in the HI-Z line
Dripsticks If a fuel gauge is u/s the quantity must be determined by using the dripsticks (floatsticks in later aircraft). The classics have 5 dripsticks in each wing tank and none in the centre tank. The NG has 6 dripsticks in each wing tank and 4 in the centre tank. Because of cumulative errors it is recommended that the wings are filled once every few sectors to ensure an even fuel balance. In-flight, the GW must be periodically updated to ensure the accuracy of VNAV speeds, buffet margin and max altitude.
Fuel quantity is measured by using a series of capacitors in the tanks with fuel acting as the dielectric. Calibration of the fuel gauges is done by capacitance trimmers, these are adjusted to standardise the total tank capacitance and allows for the replacement of gauges. On older aircraft the trimmers were accessible from the flightdeck (below the F/O’s FMC) but they have since been removed to a safer place! Capacitance trimmers

Pumps

There are two AC powered fuel pumps in each tank; there are also EDP’s at each engine. Both fuel pump low pressure lights in any tank are required to illuminate the master caution to avoid spurious warnings at high AoA’s or accelerations. Centre tank LP lights are armed only when their pumps are ON.
Leaving a fuel pump on with a low pressure light illuminated is not only an explosion risk (see Thai and Philippine write offs) but also if a pump is left running dry for over approx 10 minutes it will lose all the fuel required for priming which will render it inoperative even when the tank is refuelled. If you switch on the centre tank pumps and the LP lights remain illuminated for more than 19 seconds then this is probably what has happened. The pumps should be switched off and considered inop until they can be re-primed.

On the 1-500′s, the centre tank pumps are located in a dry area of the wing root but on the NG’s the pumps are actually inside the fuel tank (see photo below). This is why only the NG’s are affected by AD 2002-19-52 which requires the crew to maintain certain minimum fuel levels in the center fuel tanks. You can see the location of the centre tank pumps on the forward wall of the wheel well on the NG’s, since the forward wall is actually the back of the centre fuel tank.
Note: for aircraft delivered after May 2004, centre tank fuel pumps will automatically shut off when they detect a low output pressure.
Right centre tank fuel pump on the forward wall of the wheel well – NG’s only
Centre Tank Scavange Pumps
These transfer fuel from the centre tank into tank 1 at a minimum rate of 100kg/hr, although usually nearer 200kg/hr. The trigger for the scavenge pump is different for the series as follows:
  • Originals: Only fitted after l/n 990 (Dec 1983). Operates the same as the classics.
  • Classics: Switching both centre tank pumps OFF will cause the centre tank scavenge pump to transfer centre tank fuel into tank 1 for 20 minutes.
  • NG’s: The centre tank scavenge pump starts automatically when main tank 1 is half full and its FWD pump is operating. Once started, it will continue for the remainder of the flight.
NB On the classics, when departing with less than 1,000kg of fuel in the centre tank, an imbalance may occur during the climb. This is because the RH centre tank pump will stop feeding due to the body angle so number 2 engine fuel is drawn from main tank 2, while engine 1 is still drawing fuel from the centre tank. When this “runs dry” the scavenge pump will also transfer any remaining centre tank fuel into main tank 1, thereby exacerbating the imbalance.
The APU uses fuel from the number 1 tank. If AC power is available, select the No 1 tank pumps ON for APU operation to assist the fuel control unit, especially during start. Newer –500 series aircraft have an extra, DC operated APU fuel pump in the No 1 tank which operates automatically during the start sequence. The APU burns about 160Kgs/hr with electrics and an air-conditioning pack on and this should be considered in the fuel calculations if expecting a long turnaround or waiting with pax on board for a late slot.

Fuel Temperature
Limitations: Max fuel temp +49ºC, Min fuel temp -45ºC or freezing point +3ºC, whichever is higher. Typical freezing point of Jet A1 is -47ºC. If the fuel temp is approaching the lower limits you could descend into warmer air or accelerate to increase the kinetic heating. Fuel temp is taken from main tank 1 because this will be the coldest as it has less heating from the smaller hydraulic system A.
A fuel sampling and testing kit is kept on the flight deck of all aircraft to test for water.
The NG series are prone to “Upper Wing Surface Non-environmental Icing” or “Cold Soaked Fuel Frost” CSFF. This is due to cold soaked fuel causing frost to form on the wings during the turnarounds – even in warm conditions! From July 2004 NGs have been delivered with markings on the upper surface of the wings where this frost is allowable for despatch under the following conditions:
Takeoff with CSFF on the upper wing surfaces is permissible, provided the following are met:
  • the frost on the upper surface is less than 1/16 inch (1.5 mm) thick
  • the extent of the frost is similar on both wings
  • the frost is on or between the black lines defining the permissible CSFF area
  • the outside air temperature is above freezing(0 C, 32 F)
  • there is no precipitation or visible moisture at the wing surface (rain, drizzle, snow, fog)


Auxiliary Fuel System

The standard number of fuel tanks is three. Classics could be fitted with an auxiliary fourth tank which was controlled from the main panel as shown at the top of the page. The 737-200Adv could also be fitted with an auxiliary tank at the forward end of the aft hold; these were available in either 3,065 or 1,421 litre capacities.
BBJ Aux fuel panel located on Capt’s & F/O’s main panels
The BBJ can have up to 9 aux fuel tanks giving it a maximum fuel quantity of 37,712kgs (83,000lbs) although in practice this would probably take you over MTOW if any payload was carried. This fuel would give a theoretical range in excess of 6200nm. The aux tanks are located at the rear of the fwd hold and the front of the aft hold, this reduces the C of G movement as fuel is loaded and used.

Aux fuel tank in aft hold of a BBJ2 (-800 fuselage)
Refuelling of the aux tanks is done by moving the guarded switch in the refuelling panel to AUX TANKS. The controls for main tanks 1 and 2 change to aft aux (AA) and fwd aux (FA) respectively.
The aux fuel system is essentially automatic. It works by transferring fuel from the aux tanks into the centre tank where it is then fed to the engines in the normal way. Flight crew can select fwd or aft tanks but normal practice is to use both to maintain C of G balance. The fwd and aft tanks are switched off when the ALERT light illuminates on the main panel.
Aux fuel control panel (Overhead panel)
There are no pumps in the aux fuel system. Cabin differential pressure (and bleed air as a backup) is used to maintain a head of pressure in the aux tanks to push the aux fuel into the centre tank.
Aux fuel control panel (Aft overhead panel)
(All Aux fuel photos: Capt D Britchford)

Ferry Tank
The 737-200 had provision for a ferry kit. This comprised a 2,000 US Gal (7,570 litre) bladder cell which attached to the seat tracks of the passenger cabin. The fuel was fed to the centre tank through a manual valve by cabin pressure.

To date, two 737′s, 737-400 HS-TDC of Thai Airways on 3 Mar 2001 and 737-300 EI-BZG operated by Philippine Airlines on 5 Nov 1990 have been destroyed on the ground due to explosions in the empty centre fuel tank. The common factor in both accidents was that the centre tank fuel pumps were running in high ambient temperatures with empty or almost empty centre fuel tanks.
Even an empty tank has some unusable fuel which in hot conditions will evaporate and create an explosive mixture with the oxygen in the air. These incidents, and 15 more on other types since 1959, caused the FAA to issue SFAR88 in June 2001 which mandates improvements to the design and maintenance of fuel tanks to reduce the chances of such explosions in the future. These improvements include the redesign of fuel pumps, FQIS, any wiring in tanks, proximity to hot air-conditioning or pneumatic systems, etc.
737s delivered since May 2004 have had centre tank fuel pumps which automatically shut off when they detect a low output pressure and there have been many other improvements to wiring and FQIS. But the biggest improvement will be centre fuel tank inerting. This is universally considered to be the safest way forward, but is very expensive and possibly impractical. The NTSB recommended many years ago to the FAA that a fuel tank inerting system be made mandatory, but the FAA have repeatedly rejected it on cost grounds.
Boeing has developed a Nitrogen Generating System (NGS) which decreases the flammability exposure of the center wing tank to a level equivalent to or less than the main wing tanks. The NGS is an onboard inert gas system that uses an air separation module (ASM) to separate oxygen and nitrogen from the air. After the two components of the air are separated, the nitrogenenriched air (NEA) is supplied to the center wing tank and the oxygenenriched air (OEA) is vented overboard. NEA is produced in sufficient quantities, during most conditions, to decrease the oxygen content to a level where the air volume (ullage) will not support combustion. The FAA Technical Center has determined that an oxygen level of 12% is sufficient to prevent ignition, this is achievable with one module on the 737 but will require up to six on the 747.
On 21 Feb 2006 the Honeywell NGS was certified by the FAA after over 1000hrs flight testing on two 737-NGs. Aircraft from l/n 1935 (Aug 2006) to 2006 were delivered with basic provisions for NGS and more comprehensive provisioning up to l/n 2019. Full production cutover is scheduled for l/n 2620 onwards. The NGS requires no flight or ground crew action for normal system operation and is not dispatch critical.
NGS Panel in the wheel-well
Photo: Lonnie Ganz
This from the FAA Systems Fire Group website:
B-737 Ground / Flight Testing
A series of aircraft flight and ground tests were performed by the Federal Aviation Administration and the Boeing Company to evaluate the effectiveness of ground-based inerting (GBI) as a means of reducing the flammability of fuel tanks in the commercial transport fleet. Boeing made available a Boeing 737 for modification and testing. A nitrogen-enriched air (NEA) distribution manifold, designed, built, and installed by Boeing, allowed for deposit of the ground-based NEA into the center wing tank (CWT). The fuel tank was instrumented with gas sample tubing and thermocouples to allow for a measurement of fuel tank inerting and heating during the testing. The FAA developed an in-flight gas sampling system, integrated with eight oxygen analyzers, to continuously monitor the ullage oxygen concentration at eight different locations. Other data such as fuel load, air speed, altitude, and similar flight parameters were made available from the aircraft data bus. A series of ten tests were performed (five flight, five ground) under different ground and flight conditions to demonstrate the ability of GBI to reduce fuel tank flammability. It was demonstrated under the most hazardous condition-an empty center wing tank-that GBI would remain effective for a large portion of the flight, or until aircraft descent. However, it was also shown that the dual venting configuration of some Boeing airplanes would have to be modified to prevent loss of inerting at certain ground and flight cross flow conditions.
Download the Final Report (DOT/FAA/AR-01/63)  (4.8Mb)

Limitations
Max temp +49°C
Min temp -43°C or freeze pt +3°C
Max quantity 1/200: 4300 + 4100 + 4300 = 12,700kg  (2 bag ctr bays)

200Adv: 4300 + 5400 + 4300 = 14,000kg  (3 bag ctr bays)

200Adv: 4300 + 7000 + 4300 = 15,600kg  (3 bag integral)

3/4/500: 4600 + 7000 + 4600 = 16,200kg

NG’s:    3900 + 13000 + 3900 = 20,800kg
Max lateral imbalance 1/200: 680kg; All other series: 453kg
Main tanks to be full if centre contains over 453kg
For ground operation, centre tank pumps must be not be positioned to ON, unless defuelling or transferring fuel, if quantity is below 453kgs.
Centre tank pumps must be switched OFF when both LP lights illuminate.
Centre tank pumps must not be left ON unless personnel are available in the flight deck to monitor LP lights.
Centre tank pumps should not be allowed to run dry or be left running unsupervised. Crew reset of fuel pump circuit breakers in-flight is prohibited (QRH CI.2.2)

Boeing 737 Power Plant – B737

History
The original choice of powerplant was the Pratt & Whitney JT8D-1, but before the first order had been finalised the JT8D-7 was used for commonality with the current 727. The -7 was flat rated to develop the same thrust (14,000lb.st) at higher ambient temperatures than the -1 and became the standard powerplant for the -100. By the end of the -200 production the JT8D-17R was up to 17,400lb.st. thrust.
Auxiliary inlet doors were fitted to early JT8D’s around the nose cowl. These were spring loaded and opened automatically whenever the pressure differential between inlet and external static pressures was high, ie slow speed, high thrust conditions (takeoff) to give additional engine air and closed again as airspeed increased causing inlet static pressure to rise.
JT8D Cutaway
The sole powerplant for all 737′s after the -200 is the CFM-56. The core is produced by General Electric and is virtually identical to the F101 as used in the Rockwell B-1. SNECMA produce the fan, IP compressor, LP turbine, thrust reversers and all external accessories. The name “CFM” comes from GE’s commercial engine designation “CF” and SNECMA’s “M” for Moteurs.CFM 56 - 3 Cutaway
One problem with such a high bypass engine was its physical size and ground clearance; this was overcome by mounting the accessories on the lower sides to flatten the nacelle bottom and intake lip to give the “hamster pouch” look. The engines were moved forward and raised, level with the upper surface of the wing and tilted 5 degrees up which not only helped the ground clearance but also directed the exhaust downwards which reduced the effects of pylon overheating and gave some vectored thrust to assist take-off performance. The CFM56-3 proved to be almost 20% more efficient than the JT8D.
The NG’s use the CFM56-7B which has a 61 inch diameter solid titanium wide-chord fan, new LP turbine turbomachinery, FADEC, and new single crystal material in the HP turbine. All of which give an 8% fuel reduction, 15% maintenance cost reduction and greater EGT margin compared to the CFM56-3.
One of the most significant improvements in the powerplant has been to the noise levels. The original JT8D-9 engines in 1967 produced 75 decibel levels, enough to disrupt normal conversation indoors, within a noise contour that extended 12 miles along the take-off flight path. Since 1997 with the introduction of the 737-700’s CFM56-7B engines, the 75-decibel noise contour is now only 3.5 miles long.
The core engine (N2) is governed by metering fuel (see below), whereas the fan (N1) is a free turbine. The advantages of this include: minimised inter-stage bleeding, fewer stalls or surges and an increased compression ratio without decreasing efficiency.
This quote from CFMI in 1997:
“Since entering service in 1984, the CFM56-3 has established itself as the standard against which all other engines are judged in terms of reliability, durability, and cost of ownership. The fleet of nearly 1,800 CFM56-3-powered 737s in service worldwide have logged more than 61 million hours and 44 million cycles while maintaining a 99.98 percent dispatch reliability rate (one flight delayed or cancelled for engine-caused reasons per 5,000 departures), a .070 shop visit rate (one unscheduled shop visit per 14,286 flight hours), and an in-flight shutdown rate of .003 (one incident per 333,333 hours).”

Tech Insertion

“Tech Insertion” is an upgrade to the CFM56-5B & 7B available from early 2007. The package includes improvements to the HP compressor, combustor and HP & LP turbines. The package give a longer time on wing, about 5% lower maintenance costs, 15-20% lower oxides of nitrogen (NOx) emissions, and 1% lower fuel burn.
Tech Insertion will become the new production configuration for both the CFM56-7B and CFM56-5B. CFM is also defining potential upgrade kits that could be made available to operators by late 2007.

CFM56-7BE “Evolution”

The new CFM56-7BE Product Improvement package announced in 2009 will have the following design changes & improvements:
  • HPC outlet guide vane diffuser area ratio improved and pressure losses reduced.
  • HPT blades numbers reduced, axial chord increased, tip geometry improved. Rotor redesigned.
  • LPT blade & vane numbers reduced and profiles based on optimized loading distribution. LEAP56 incorporated.
  • Primary nozzle, plug & strut faring all redesigned.
The -7BE will be able to be intermixed with regular SAC/DAC or Tech Insertion engines subject to updated FMC, MEDB and EEC. Entry into service is planned for mid-2011
From the press 2 Aug 2010:
CFM International has won certification for its upgraded CFM56-7BE engine from the FAA and the European Aviation Safety Agency (EASA), and is working with Boeing to prepare for flight tests on a Boeing 737 starting in the fourth quarter of this year.
Entry into service is planned for mid-2011 to coincide with 737 airframe improvements that, together with the engine upgrade, are designed to provide a 2% improvement in fuel consumption. CFM provisionally scheduled engine certification by the end of the third quarter, but says development, including recently completed flight tests, have progressed faster than expected. Improvements include a new high-pressure compressor outlet guide vane diffuser, high-pressure turbine blades, disks and forward outer seal. The package also includes a new design of low-pressure turbine blades, vanes and disk.
The first full CFM56-7BE type design engine completed ground testing in January 2010, and overall completed 390 hours of ground testing, says the Franco-U.S. engine maker. In addition, the upgraded CFM completed a 60-hour certification flight test program in May on GE’s modified 747 flying testbed in Victorville, Calif.
At the recent Farnborough International Airshow, company officials said discussions are continuing with Airbus about a possible upgrade for the CFM56-5B for the A320 family based on the same technology suite. A decision on whether or not an upgraded variant will be developed for Airbus will be finalized by year-end, adds the engine maker.

Fuel

Thrust (fuel flow) is controlled primarily by a hydro-mechanical MEC in response to thrust lever movement, as fitted to the original 737-1/200’s. In the –3/4/500 series, fuel flow is further refined electronically by the PMC, which acts without thrust lever movement. The 737-NG models go one stage further with FADEC (EEC).
The 3/4/500′s may be flown with PMC’s inoperative, but an RTOW penalty (ie N1 reduction) is imposed because the N1 section will increase by approximately 4% during take-off due to windmilling effects (FOTB 737-1, Jan 1985). This reduction should save reaching any engine limits. The thrust levers should not be re-adjusted during the take-off after thrust is set unless a red-line limit is likely to be exceeded, ie you should allow the N1′s to windmill up.
Fuel is heated to avoid icing by the returning oil in the MEC.

Oil

Oil pressure is measured before the bearings, where you need it; oil temperature on return, at its hottest; and oil quantity at the tank, which drops after engine start. Oil pressure is unregulated, therefore the yellow band (13-26psi) is only valid at take-off thrust whereas the lower red line (13psi) is valid at all times. If the oil pressure is ever at or below the red line, the LOW OIL PRESSURE light will illuminate and that engine should be shut down. NB on the 737-1/200 when the oil quantity gauge reads zero, there could still be up to 5 quarts present.

Ignition

There are two independent AC ignition systems, L & R. Starting with R selected on the first flight of the day provides a check of the AC standby bus, which would be your only electrical source with the loss of thrust on both engines and no APU. Normally, in-flight, no igniters are in use as the combustion is self-sustaining. During engine start or take-off & landing, GND & CONT use the selected igniters. In conditions of moderate or severe precipitation, turbulence or icing, or for an in-flight relight, FLT should be selected to use both igniters. NG aircraft: for in-flight engine starts, GRD arms both igniters.
The 737-NG’s allow the EEC to switch the ignition ON or OFF under certain conditions:
  • ON: For flameout protection. The EEC will automatically switch on both ignition systems if a flameout is detected.
  • OFF: For ground start protection. The EEC will automatically switch off both ignition systems if a hot or wet start is detected.
Note that older 737-200s have ignition switch positions named GRD, OFF, L IGN, R IGN and FLT while newer 737s use GRD, OFF, CONT and FLT. This is why QRH uses “ON” (eg in the One Engine Inop Landing checklist) to cover both LOW IGN & CONT for operators with mixed fleets consisting of old and new versions of the 737.
737-200 Ignition panel

Engine Starting

Min duct pressure for start (Classics only): 30psi at msl, -½psi per 1000ft pressure altitude. Max: 48psi.
Min 25% N2 (or 20% N2 at max motoring) to introduce fuel; any sooner could result in a hot start. Max motoring is when N2 does not increase by more than 1% in 5 seconds.
Aborted engine start criteria:
  • No N1 (before start lever is raised to idle).
  • No oil pressure (by the time the engine is stable).
  • No EGT (within 10 secs of start lever being raised to idle).
  • No increase, or very slow increase, in N1 or N2 (after EGT indication).
  • EGT rapidly approaching or exceeding 725˚C.
An abnormal start advisory does not by itself mean that you have to abort the engine start.
Starter cutout is approx 46% N2 -3/4/500; 56% N2 -NG’s.
Starter duty cycle is:
  • First attempt: 2mins on, 20sec off.
  • Second and subsequent attempts: 2mins on, 3mins off.
Do not re-engage engine start switch until N2 is below 20%.
During cold weather starts, oil pressure may temporary exceed the green band or may not show any increase until oil temperature rises. No indication of oil pressure by the time idle RPM is achieved requires an immediate engine shutdown. At low ambient temperatures, a temporary high oil pressure above the green band may be tolerated.
When starting the engines in tailwind conditions, Boeing recommends making a normal start. Expect a longer cranking time to ensure N1 is rotating in the correct direction before moving the start lever. A higher than normal EGT should be expected, yet the same limits and procedures should apply.

Upper DU

Lower DU

Upper DU in Compact Display mode
The Compact Display mode can only be shown when the MFD ENG button is pressed for the first time after the aircraft has been completely shut down. The photo shows this display with one engine started and nicely illustrates the blank parameters which are controlled by the EEC and hence are only displayed when the EEC powers up when the associated start switch is selected to GND. During start-up the EEC’s receive electrical power from the AC transfer busses, but their normal source of power are their own alternators which cut-in when N2 is above 15%.
-200Adv Engine Instruments
Round Dial -3/400 Engine Instruments
3/4/500 EIS
NG EIS

EIS Display

The introduction of Engine Instrument System (EIS) in late 1988 gave many advantages over the electromechanical instruments present since 1967. ie a 10lb weight reduction, improved reliability, reduction in power consumption, detection of impending abnormal starts, storage of exceedances and a Built In Test Equipment (BITE) check facility.
The BITE check is accessed by pressing a small recessed button at the bottom of each eis panel, this is only possible when both engines N1 are below 10%. Pressing these buttons will show an LED check during which the various checks are conducted. If any of the checks fail, the appropriate code will be shown in place of the affected parameters readout. The following codes are used:
Primary EIS BITE Codes
Code Fault
ROM Read Only Memory check
RAM Random Access Memory check
FDC Frequency to Digital Converter check
ENG Engine Identity Inputs (not fuel flow)
PWR Power Monitor
MMF Maint Module Fault (fuel flow only)
RTC Real Time Clock (fuel flow only)
ERF Exceedance RAM Full (fuel flow only)
A/D Analogue to Digital Converter (fuel flow only)
ARF ARINC Receiver Fault (fuel flow only)
uP Microprocessor
Any exceedance of either N1, N2 or EGT is recorded at 1 sec intervals in a non-volatile memory along with the fuel flow at the time, this data can be downloaded by connecting an ARINC 429 bus reader. Up to 10 minutes of data can be stored. The last exceedance is also put into volatile memory and can be read straight from the EIS before aircraft electrical power is removed. This is done by pressing the primary EIS BITE button twice within 2 seconds, this will then alternately display the highest reading and the duration of the exceedance in seconds.
Secondary EIS BITE Codes
Code Fault
0- Microprocessor
1- Program Memory
2- Random Access Memory check
3- Analogue to Digital Converter
4- Power Monitor
5- 400Hz Reference Voltage
6- ARINC Receiver Fault

Airborne Vibration Monitors (AVM)

All series of 737 have the facility for AVM although not all 737-200′s have them fitted. The early 737-1/200′s had two vibration pickup points; One at the turbine section and one at the engine inlet there was a selector switch so that the crew could choose which to monitor. Some even had a high and low frequency filter selection switch.
From Boeing Flt Ops Review, Feb 2003: “On airplanes with AVM procedures, flight crews should also be made aware that AVM indications are not valid while at takeoff power settings, during power changes, or until after engine thermal stabilization. High AVM indications can also be observed during operations in icing conditions.”

High Pressure Turbine Clearance Control

The HPTCC system uses HP compressor bleed air to obtain maximum steady state HPT performance and to minimise EGT transient overshoot during rapid change of engine speed.

Variable Stator Vanes

The VSV actuation system controls primary airflow through the HP compressor by varying the angle of the inlet guide vanes and three stages of variable stator vanes.

Variable Bleed Valves

Control airflow quantity to the HP compressor. They are fully open during rapid accelerations and reverse thrust operation.

Dual Annular Combustors (DAC)

The CFM56-7B is available with an optional DAC system, known as the CFM56-7B/2, which considerably reduces NOx emissions. DAC have 20 double tip fuel nozzles instead of the single tip and a dual annular shaped combustion chamber. The number of nozzles in use: 20/0, 20/10 or 20/20, varies depending upon thrust required. The precise N1 ranges of the different modes varies with ambient conditions.
  • 20/20 mode – High power (cruise N1 and above)
  • 20/10 mode – Medium power
  • 20/00 mode – Low power (Idle N1)
This gives a lean fuel/air mixture, which reduces flame temperatures, and also gives higher throughput velocities which reduce the residence time available to form NOx. The net result is up to 40% less NOx emissions than a standard CFM56-7.
The first were installed on the 737-600 fleet of SAS but unfortunately were subject to resonance in the LPT-1 blades during operation in the 20/10 mode, which occurred in an N1 range usually used during descent and approach. Although there were no in-flight shutdowns, boroscope inspections revealed that the LPT blades were starting to separate. CFM quickly replaced all blades on all DAC engines with reinforced blades and have since replaced them again with a new redesigned blade.

Reverse Thrust

The original 737-1/200 thrust reversers were pneumatically powered clamshell doors taken straight from the 727 (shown left). When reverse was selected, 13th stage bleed air was ported to a pneumatic actuator that rotated the deflector doors and clamshell doors into position. Unfortunately they were relatively ineffective and apparently tended to push the aircraft up off the runway when deployed. This reduced the downforce on the main wheels thereby reducing the effectiveness of the wheel brakes.
By 1969 these had been changed by Boeing and Rohr to the much more successful hydraulically powered target type thrust reversers (shown right). This required a 48 inch extension to the tailpipe to accommodate the two cylindrical deflector doors which were mounted on a four bar linkage system and associated hydraulics. The doors are set 35 degrees away from the vertical to allow the exhaust to be deflected inboard and over the wings and outboard and under the wings. This ensures that exhaust and debris is not blown into the wheel-well, nor is it blown directly downwards which would lift the weight off the wheels or be re-ingested. Fortunately the new longer nacelle improved cruise performance by improving internal airflow within the engine and also reduced cruise drag. These thrust reversers are locked against inadvertent deployment by both deflector door locks and the four bar linkage being overcenter. To illustrate how poor the original clamshell system was, Boeings own data says target type thrust reversers at 1.5 EPR are twice as effective as clamshells at full thrust!
The CFM56 uses blocker doors and cascade vanes to direct fan air forwards. Net reverse thrust is defined as: fan reverser air, minus forward thrust from engine core, plus form drag from the blocker door. As this is significantly greater at higher thrust, reverse thrust should be used immediately after landing or RTO and, if conditions allow, should be reduced to idle by 60kts to avoid debris ingestion damage. Caution: It is possible to deploy reverse thrust when either Rad Alt is below 10ft – this is not recommended.

The REVERSER light shows either control valve or sleeve position disagreement or that the auto-restow circuit is activated. This light will illuminate every time the reverser is commanded to stow, but extinguishes after the stow has completed, and will only bring up master caution ENG if a malfunction has occurred. Recycling the reverse thrust will often clear the fault. If this occurs in-flight, reverse thrust will be available after landing.
The REVERSER UNLOCKED light (EIS panel) is potentially much more serious and will illuminate in-flight if a sleeve has mechanically unlocked. Follow the QRH drill, but only multiple failures will allow the engine to go into reverse thrust.

The 737-1/200 thrust reverser panel has a LOW PRESSURE light which refers to the reverser accumulator pressure when insufficient pressure is available to deploy the reversers. The blue caption between the switches is ISOLATION VALVE and illuminates when the three conditions for reverse thrust are satisfied: Engine running, Aircraft on ground & Fire switches in normal position. The guarded NORMAL / OVERRIDE switches to enable the reverse thrust to be selected on the ground with the engines stopped (for maintenance purposes).


HushKits
The first “hushkit” was not visible externally, in 1982 exhaust mixers were made available for the JT8D-15, -17 or -17R. These were fitted behind the LP turbine to mix the hot gas core airflow with the cooler bypassed fan air. This increased mixing reduced noise levels by up to 3.6 EPNdB.
Several different Stage III hushkits have been available from manufacturers Nordam (shown right) and AvAero since 1992. The Nordam comes in HGW and LGW versions.
As hushkits use more fuel, the EU tried to ban all hushkitted aircraft flying into the EU from April 2002. This was strongly opposed and the directive has been changed to allow hushkitted aircraft to use airports which will accept them.
737 classics may be fitted with hardwall forward acoustic panels which reduce noise by 1 EPNdB

Additional References


Limitations

Series 1/200 3/4/500 6/7/8/900/BBJ
Engine JT8-17A CFM56-3 CFM56-7
 


Max time limit for take-off or go-around thrust: 5 mins 5 mins * 5 mins *
Max N1 102.4% 106% 104%
Max N2 100% 105% 105%
  Max EGT’s:


Take-off (5 min limit) 650°C 930°C 950°C
Continuous 610°C 895°C 925°C
Start 575°C 725°C 725°C
  Oil T’s & P’s


Max temperature 165°C 165°C 155°C
15 minute limit (45 minute limit on NG) 130-165°C 160-165°C 140-155°C
Max continuous 130°C 160°C 140°C
Min oil press 40psi 13psi (warning light), 26psi (gauge) 13psi (warning light), 26psi (gauge)
Min oil quantity (at dispatch) 2.25 USG 60% full (12 US Quarts) ** 60% full (12 US Quarts) **
Starting pressures prior to starter engagement
30psi -1/2psi per 1000′ amsl
N/A
Starter duty cycle 1st attempt: 2min on, 20sec off 2nd & subsequent attempt: 2min on, 3min off 2mins on, 10secs off.
* May be increased to 10 mins if certified** See AMM Task 12-13-11-600-801

Engine Ratings

Maximum Certified Thrust – This is the maximum thrust certified during testing for each series of 737. This is also the thrust that you get when you firewall the thrust levers, regardless of the maximum rated thrust.
On the 737NG, the EEC limits the maximum certified thrust gained from data in the engine strut according to the airplane model as follows:
Aircraft Series Maximum Certified Thrust
737-600 CFM56-7B22 = 22,700lb.st
737-700 CFM56-7B24 = 24,200lb.st
737-800 CFM56-7B27 = 27,300lb.st
737-900 CFM56-7B27 = 27,300lb.st

Maximum Rated Thrust – This is the maximum thrust for the installed engine that the autothrottle will command. This is specified by the operator from the options in the table below.
Engine Aircraft Series Max Static Thrust (lb.st.) Bypass Ratio EGT Margin (C)
JT8D-7/7A/7B 1/200 14,000 1.10
JT8D-9/9A 1/200 14,500 1.04
JT8D-15/15A 200Adv 15,500 0.99
JT8D-17/17A 200Adv 16,000 1.02
JT8D-17R 200Adv 17,400 1.00
CFM56-3B4 500 18,500 5.0 90
CFM56-3B1 3/500 20,000 5.0 70
CFM56-3B2 3/400 22,000 5.0 50
CFM56-3C1 400 23,500 4.9 45
CFM56-7B18 600 19,500 5.5 145
CFM56-7B20 6/700 20,600 5.4 148
CFM56-7B22 6/700 22,700 5.3 150
CFM56-7B24 7/8/900 24,200 5.3 125
CFM56-7B26 7/8/900/BBJ 26,400 5.1 85
CFM56-7B27 8/900/BBJ 27,300 5.0 ?

Misc Photos

The left hand side of the CFM56-3. The large silver coloured pipe is the start air manifold with the starter located at its base. The black unit below that is the CSD. The green unit forward (left) of the CSD is the generator cooling air collector shroud, the silver-gold thing forward of that (with the wire bundle visible) is the generator, and the green cap most forward is the generator cooling air inlet.
The view into the JT8D jetpipe.The corrugated ring is the mixer unit, this is designed to thoroughly mix the bypass air with the turbine exhaust. The exhaust cone makes a divergent flow which slows down the exhaust and also protects the rear face of the last turbine stage.
The view into the CFM56-3 jetpipe.This is the turbine exhaust area, no mixing is required as the bypass air is exhausted coaxially.
There are two fan inlet temperature sensors in the CFM56-3 engine intake. The one at the 2 o’clock position is used by the PMC and the one at the 11 o’clock position is used by the MEC. The MEC uses the signal to establish parameters to control low and high idle power schedules.The temperature data is used for thrust management and variable bleed valves, variable stator vanes & high / low pressure turbine clearance control systems.
The CFM56-7 inlet has just one fan inlet temperature probe, which is for the EEC (because there is no PMC on the NG’s).A subtle difference between the NG & classic temp probes is that the NG’s only use inlet temp data on the ground and for 5 minutes after take-off. In-flight after 5 minutes temp data is taken from the ADIRU’s. The temperature data is used for thrust management and variable bleed valves, variable stator vanes & high / low pressure turbine clearance control systems.
The CFM56-7 spinner has a unique conelliptical profile. The first 737-3/400′s had a conical (sharp pointed) spinner but these tended to shed ice into the core. This was one of the reasons for the early limitation of minimum 45% N1 in icing conditions which made descent management quite difficult. They were later replaced with elliptical (round nosed) spinners which succeeded in deflecting the ice away from the core, but because of their larger stagnation point, were more prone to picking up ice in the first place. The conelliptical spinner of the NG’s neatly solves both problems.
The CFM56-7 tailpipe is slightly longer then the CFM56-3 and has a small tube protruding from the faring. This is the Aft Fairing Drain Tube for any hydraulic fluid, oil or fuel that may collect in there. There is also a second drain tube that does not protrude located on the inside of the fairing.
The JT8D tailpipe fitted as standard from l/n 135 onwards.The original thrust reversers were totally redesigned by Boeing and Rohr since the aircraft had inherited the same internal pneumatically powered clamshell thrust reversers as the 727 which were relatively ineffective and apparently tended to lift the aircraft off the runway when deployed! The redesign to external hydraulically powered target reversers cost Boeing $24 million but dramatically improved its short field performance which boosted sales to carriers proposing to use the aircraft as a regional jet from short runways. Also the engine nacelles were extended by 1.14m as a drag reduction measure.
The outboard side of the JT8D-9A with the cowling open.

istory

The original choice of powerplant was the Pratt & Whitney JT8D-1, but before the first order had been finalised the JT8D-7 was used for commonality with the current 727. The -7 was flat rated to develop the same thrust (14,000lb.st) at higher ambient temperatures than the -1 and became the standard powerplant for the -100. By the end of the -200 production the JT8D-17R was up to 17,400lb.st. thrust.
Auxiliary inlet doors were fitted to early JT8D’s around the nose cowl. These were spring loaded and opened automatically whenever the pressure differential between inlet and external static pressures was high, ie slow speed, high thrust conditions (takeoff) to give additional engine air and closed again as airspeed increased causing inlet static pressure to rise.
JT8D Cutaway
The sole powerplant for all 737′s after the -200 is the CFM-56. The core is produced by General Electric and is virtually identical to the F101 as used in the Rockwell B-1. SNECMA produce the fan, IP compressor, LP turbine, thrust reversers and all external accessories. The name “CFM” comes from GE’s commercial engine designation “CF” and SNECMA’s “M” for Moteurs.CFM 56 - 3 Cutaway
One problem with such a high bypass engine was its physical size and ground clearance; this was overcome by mounting the accessories on the lower sides to flatten the nacelle bottom and intake lip to give the “hamster pouch” look. The engines were moved forward and raised, level with the upper surface of the wing and tilted 5 degrees up which not only helped the ground clearance but also directed the exhaust downwards which reduced the effects of pylon overheating and gave some vectored thrust to assist take-off performance. The CFM56-3 proved to be almost 20% more efficient than the JT8D.
The NG’s use the CFM56-7B which has a 61 inch diameter solid titanium wide-chord fan, new LP turbine turbomachinery, FADEC, and new single crystal material in the HP turbine. All of which give an 8% fuel reduction, 15% maintenance cost reduction and greater EGT margin compared to the CFM56-3.
One of the most significant improvements in the powerplant has been to the noise levels. The original JT8D-9 engines in 1967 produced 75 decibel levels, enough to disrupt normal conversation indoors, within a noise contour that extended 12 miles along the take-off flight path. Since 1997 with the introduction of the 737-700’s CFM56-7B engines, the 75-decibel noise contour is now only 3.5 miles long.
The core engine (N2) is governed by metering fuel (see below), whereas the fan (N1) is a free turbine. The advantages of this include: minimised inter-stage bleeding, fewer stalls or surges and an increased compression ratio without decreasing efficiency.
This quote from CFMI in 1997:
“Since entering service in 1984, the CFM56-3 has established itself as the standard against which all other engines are judged in terms of reliability, durability, and cost of ownership. The fleet of nearly 1,800 CFM56-3-powered 737s in service worldwide have logged more than 61 million hours and 44 million cycles while maintaining a 99.98 percent dispatch reliability rate (one flight delayed or cancelled for engine-caused reasons per 5,000 departures), a .070 shop visit rate (one unscheduled shop visit per 14,286 flight hours), and an in-flight shutdown rate of .003 (one incident per 333,333 hours).”

Tech Insertion

“Tech Insertion” is an upgrade to the CFM56-5B & 7B available from early 2007. The package includes improvements to the HP compressor, combustor and HP & LP turbines. The package give a longer time on wing, about 5% lower maintenance costs, 15-20% lower oxides of nitrogen (NOx) emissions, and 1% lower fuel burn.
Tech Insertion will become the new production configuration for both the CFM56-7B and CFM56-5B. CFM is also defining potential upgrade kits that could be made available to operators by late 2007.

CFM56-7BE “Evolution”

The new CFM56-7BE Product Improvement package announced in 2009 will have the following design changes & improvements:
  • HPC outlet guide vane diffuser area ratio improved and pressure losses reduced.
  • HPT blades numbers reduced, axial chord increased, tip geometry improved. Rotor redesigned.
  • LPT blade & vane numbers reduced and profiles based on optimized loading distribution. LEAP56 incorporated.
  • Primary nozzle, plug & strut faring all redesigned.
The -7BE will be able to be intermixed with regular SAC/DAC or Tech Insertion engines subject to updated FMC, MEDB and EEC. Entry into service is planned for mid-2011
From the press 2 Aug 2010:
CFM International has won certification for its upgraded CFM56-7BE engine from the FAA and the European Aviation Safety Agency (EASA), and is working with Boeing to prepare for flight tests on a Boeing 737 starting in the fourth quarter of this year.
Entry into service is planned for mid-2011 to coincide with 737 airframe improvements that, together with the engine upgrade, are designed to provide a 2% improvement in fuel consumption. CFM provisionally scheduled engine certification by the end of the third quarter, but says development, including recently completed flight tests, have progressed faster than expected. Improvements include a new high-pressure compressor outlet guide vane diffuser, high-pressure turbine blades, disks and forward outer seal. The package also includes a new design of low-pressure turbine blades, vanes and disk.
The first full CFM56-7BE type design engine completed ground testing in January 2010, and overall completed 390 hours of ground testing, says the Franco-U.S. engine maker. In addition, the upgraded CFM completed a 60-hour certification flight test program in May on GE’s modified 747 flying testbed in Victorville, Calif.
At the recent Farnborough International Airshow, company officials said discussions are continuing with Airbus about a possible upgrade for the CFM56-5B for the A320 family based on the same technology suite. A decision on whether or not an upgraded variant will be developed for Airbus will be finalized by year-end, adds the engine maker.

Fuel

Thrust (fuel flow) is controlled primarily by a hydro-mechanical MEC in response to thrust lever movement, as fitted to the original 737-1/200’s. In the –3/4/500 series, fuel flow is further refined electronically by the PMC, which acts without thrust lever movement. The 737-NG models go one stage further with FADEC (EEC).
The 3/4/500′s may be flown with PMC’s inoperative, but an RTOW penalty (ie N1 reduction) is imposed because the N1 section will increase by approximately 4% during take-off due to windmilling effects (FOTB 737-1, Jan 1985). This reduction should save reaching any engine limits. The thrust levers should not be re-adjusted during the take-off after thrust is set unless a red-line limit is likely to be exceeded, ie you should allow the N1′s to windmill up.
Fuel is heated to avoid icing by the returning oil in the MEC.

Oil

Oil pressure is measured before the bearings, where you need it; oil temperature on return, at its hottest; and oil quantity at the tank, which drops after engine start. Oil pressure is unregulated, therefore the yellow band (13-26psi) is only valid at take-off thrust whereas the lower red line (13psi) is valid at all times. If the oil pressure is ever at or below the red line, the LOW OIL PRESSURE light will illuminate and that engine should be shut down. NB on the 737-1/200 when the oil quantity gauge reads zero, there could still be up to 5 quarts present.

Ignition

There are two independent AC ignition systems, L & R. Starting with R selected on the first flight of the day provides a check of the AC standby bus, which would be your only electrical source with the loss of thrust on both engines and no APU. Normally, in-flight, no igniters are in use as the combustion is self-sustaining. During engine start or take-off & landing, GND & CONT use the selected igniters. In conditions of moderate or severe precipitation, turbulence or icing, or for an in-flight relight, FLT should be selected to use both igniters. NG aircraft: for in-flight engine starts, GRD arms both igniters.
The 737-NG’s allow the EEC to switch the ignition ON or OFF under certain conditions:
  • ON: For flameout protection. The EEC will automatically switch on both ignition systems if a flameout is detected.
  • OFF: For ground start protection. The EEC will automatically switch off both ignition systems if a hot or wet start is detected.
Note that older 737-200s have ignition switch positions named GRD, OFF, L IGN, R IGN and FLT while newer 737s use GRD, OFF, CONT and FLT. This is why QRH uses “ON” (eg in the One Engine Inop Landing checklist) to cover both LOW IGN & CONT for operators with mixed fleets consisting of old and new versions of the 737.
737-200 Ignition panel

Engine Starting

Min duct pressure for start (Classics only): 30psi at msl, -½psi per 1000ft pressure altitude. Max: 48psi.
Min 25% N2 (or 20% N2 at max motoring) to introduce fuel; any sooner could result in a hot start. Max motoring is when N2 does not increase by more than 1% in 5 seconds.
Aborted engine start criteria:
  • No N1 (before start lever is raised to idle).
  • No oil pressure (by the time the engine is stable).
  • No EGT (within 10 secs of start lever being raised to idle).
  • No increase, or very slow increase, in N1 or N2 (after EGT indication).
  • EGT rapidly approaching or exceeding 725˚C.
An abnormal start advisory does not by itself mean that you have to abort the engine start.
Starter cutout is approx 46% N2 -3/4/500; 56% N2 -NG’s.
Starter duty cycle is:
  • First attempt: 2mins on, 20sec off.
  • Second and subsequent attempts: 2mins on, 3mins off.
Do not re-engage engine start switch until N2 is below 20%.
During cold weather starts, oil pressure may temporary exceed the green band or may not show any increase until oil temperature rises. No indication of oil pressure by the time idle RPM is achieved requires an immediate engine shutdown. At low ambient temperatures, a temporary high oil pressure above the green band may be tolerated.
When starting the engines in tailwind conditions, Boeing recommends making a normal start. Expect a longer cranking time to ensure N1 is rotating in the correct direction before moving the start lever. A higher than normal EGT should be expected, yet the same limits and procedures should apply.

Upper DU

Lower DU

Upper DU in Compact Display mode
The Compact Display mode can only be shown when the MFD ENG button is pressed for the first time after the aircraft has been completely shut down. The photo shows this display with one engine started and nicely illustrates the blank parameters which are controlled by the EEC and hence are only displayed when the EEC powers up when the associated start switch is selected to GND. During start-up the EEC’s receive electrical power from the AC transfer busses, but their normal source of power are their own alternators which cut-in when N2 is above 15%.
-200Adv Engine Instruments
Round Dial -3/400 Engine Instruments
3/4/500 EIS
NG EIS

EIS Display

The introduction of Engine Instrument System (EIS) in late 1988 gave many advantages over the electromechanical instruments present since 1967. ie a 10lb weight reduction, improved reliability, reduction in power consumption, detection of impending abnormal starts, storage of exceedances and a Built In Test Equipment (BITE) check facility.
The BITE check is accessed by pressing a small recessed button at the bottom of each eis panel, this is only possible when both engines N1 are below 10%. Pressing these buttons will show an LED check during which the various checks are conducted. If any of the checks fail, the appropriate code will be shown in place of the affected parameters readout. The following codes are used:
Primary EIS BITE Codes
Code Fault
ROM Read Only Memory check
RAM Random Access Memory check
FDC Frequency to Digital Converter check
ENG Engine Identity Inputs (not fuel flow)
PWR Power Monitor
MMF Maint Module Fault (fuel flow only)
RTC Real Time Clock (fuel flow only)
ERF Exceedance RAM Full (fuel flow only)
A/D Analogue to Digital Converter (fuel flow only)
ARF ARINC Receiver Fault (fuel flow only)
uP Microprocessor
Any exceedance of either N1, N2 or EGT is recorded at 1 sec intervals in a non-volatile memory along with the fuel flow at the time, this data can be downloaded by connecting an ARINC 429 bus reader. Up to 10 minutes of data can be stored. The last exceedance is also put into volatile memory and can be read straight from the EIS before aircraft electrical power is removed. This is done by pressing the primary EIS BITE button twice within 2 seconds, this will then alternately display the highest reading and the duration of the exceedance in seconds.
Secondary EIS BITE Codes
Code Fault
0- Microprocessor
1- Program Memory
2- Random Access Memory check
3- Analogue to Digital Converter
4- Power Monitor
5- 400Hz Reference Voltage
6- ARINC Receiver Fault

Airborne Vibration Monitors (AVM)

All series of 737 have the facility for AVM although not all 737-200′s have them fitted. The early 737-1/200′s had two vibration pickup points; One at the turbine section and one at the engine inlet there was a selector switch so that the crew could choose which to monitor. Some even had a high and low frequency filter selection switch.
From Boeing Flt Ops Review, Feb 2003: “On airplanes with AVM procedures, flight crews should also be made aware that AVM indications are not valid while at takeoff power settings, during power changes, or until after engine thermal stabilization. High AVM indications can also be observed during operations in icing conditions.”

High Pressure Turbine Clearance Control

The HPTCC system uses HP compressor bleed air to obtain maximum steady state HPT performance and to minimise EGT transient overshoot during rapid change of engine speed.

Variable Stator Vanes

The VSV actuation system controls primary airflow through the HP compressor by varying the angle of the inlet guide vanes and three stages of variable stator vanes.

Variable Bleed Valves

Control airflow quantity to the HP compressor. They are fully open during rapid accelerations and reverse thrust operation.

Dual Annular Combustors (DAC)

The CFM56-7B is available with an optional DAC system, known as the CFM56-7B/2, which considerably reduces NOx emissions. DAC have 20 double tip fuel nozzles instead of the single tip and a dual annular shaped combustion chamber. The number of nozzles in use: 20/0, 20/10 or 20/20, varies depending upon thrust required. The precise N1 ranges of the different modes varies with ambient conditions.
  • 20/20 mode – High power (cruise N1 and above)
  • 20/10 mode – Medium power
  • 20/00 mode – Low power (Idle N1)
This gives a lean fuel/air mixture, which reduces flame temperatures, and also gives higher throughput velocities which reduce the residence time available to form NOx. The net result is up to 40% less NOx emissions than a standard CFM56-7.
The first were installed on the 737-600 fleet of SAS but unfortunately were subject to resonance in the LPT-1 blades during operation in the 20/10 mode, which occurred in an N1 range usually used during descent and approach. Although there were no in-flight shutdowns, boroscope inspections revealed that the LPT blades were starting to separate. CFM quickly replaced all blades on all DAC engines with reinforced blades and have since replaced them again with a new redesigned blade.

Reverse Thrust

The original 737-1/200 thrust reversers were pneumatically powered clamshell doors taken straight from the 727 (shown left). When reverse was selected, 13th stage bleed air was ported to a pneumatic actuator that rotated the deflector doors and clamshell doors into position. Unfortunately they were relatively ineffective and apparently tended to push the aircraft up off the runway when deployed. This reduced the downforce on the main wheels thereby reducing the effectiveness of the wheel brakes.
By 1969 these had been changed by Boeing and Rohr to the much more successful hydraulically powered target type thrust reversers (shown right). This required a 48 inch extension to the tailpipe to accommodate the two cylindrical deflector doors which were mounted on a four bar linkage system and associated hydraulics. The doors are set 35 degrees away from the vertical to allow the exhaust to be deflected inboard and over the wings and outboard and under the wings. This ensures that exhaust and debris is not blown into the wheel-well, nor is it blown directly downwards which would lift the weight off the wheels or be re-ingested. Fortunately the new longer nacelle improved cruise performance by improving internal airflow within the engine and also reduced cruise drag. These thrust reversers are locked against inadvertent deployment by both deflector door locks and the four bar linkage being overcenter. To illustrate how poor the original clamshell system was, Boeings own data says target type thrust reversers at 1.5 EPR are twice as effective as clamshells at full thrust!
The CFM56 uses blocker doors and cascade vanes to direct fan air forwards. Net reverse thrust is defined as: fan reverser air, minus forward thrust from engine core, plus form drag from the blocker door. As this is significantly greater at higher thrust, reverse thrust should be used immediately after landing or RTO and, if conditions allow, should be reduced to idle by 60kts to avoid debris ingestion damage. Caution: It is possible to deploy reverse thrust when either Rad Alt is below 10ft – this is not recommended.

The REVERSER light shows either control valve or sleeve position disagreement or that the auto-restow circuit is activated. This light will illuminate every time the reverser is commanded to stow, but extinguishes after the stow has completed, and will only bring up master caution ENG if a malfunction has occurred. Recycling the reverse thrust will often clear the fault. If this occurs in-flight, reverse thrust will be available after landing.
The REVERSER UNLOCKED light (EIS panel) is potentially much more serious and will illuminate in-flight if a sleeve has mechanically unlocked. Follow the QRH drill, but only multiple failures will allow the engine to go into reverse thrust.

The 737-1/200 thrust reverser panel has a LOW PRESSURE light which refers to the reverser accumulator pressure when insufficient pressure is available to deploy the reversers. The blue caption between the switches is ISOLATION VALVE and illuminates when the three conditions for reverse thrust are satisfied: Engine running, Aircraft on ground & Fire switches in normal position. The guarded NORMAL / OVERRIDE switches to enable the reverse thrust to be selected on the ground with the engines stopped (for maintenance purposes).
HushKits
The first “hushkit” was not visible externally, in 1982 exhaust mixers were made available for the JT8D-15, -17 or -17R. These were fitted behind the LP turbine to mix the hot gas core airflow with the cooler bypassed fan air. This increased mixing reduced noise levels by up to 3.6 EPNdB.
Several different Stage III hushkits have been available from manufacturers Nordam (shown right) and AvAero since 1992. The Nordam comes in HGW and LGW versions.
As hushkits use more fuel, the EU tried to ban all hushkitted aircraft flying into the EU from April 2002. This was strongly opposed and the directive has been changed to allow hushkitted aircraft to use airports which will accept them.
737 classics may be fitted with hardwall forward acoustic panels which reduce noise by 1 EPNdB

Additional References

Limitations

Series 1/200 3/4/500 6/7/8/900/BBJ
Engine JT8-17A CFM56-3 CFM56-7
 


Max time limit for take-off or go-around thrust: 5 mins 5 mins * 5 mins *
Max N1 102.4% 106% 104%
Max N2 100% 105% 105%
Max EGT’s:


Take-off (5 min limit) 650°C 930°C 950°C
Continuous 610°C 895°C 925°C
Start 575°C 725°C 725°C
Oil T’s & P’s


Max temperature 165°C 165°C 155°C
15 minute limit (45 minute limit on NG) 130-165°C 160-165°C 140-155°C
Max continuous 130°C 160°C 140°C
Min oil press 40psi 13psi (warning light), 26psi (gauge) 13psi (warning light), 26psi (gauge)
Min oil quantity (at dispatch) 2.25 USG 60% full (12 US Quarts) ** 60% full (12 US Quarts) **
Starting pressures prior to starter engagement
30psi -1/2psi per 1000′ amsl
N/A
Starter duty cycle 1st attempt: 2min on, 20sec off 2nd & subsequent attempt: 2min on, 3min off 2mins on, 10secs off.
* May be increased to 10 mins if certified** See AMM Task 12-13-11-600-801

Engine Ratings

Maximum Certified Thrust – This is the maximum thrust certified during testing for each series of 737. This is also the thrust that you get when you firewall the thrust levers, regardless of the maximum rated thrust.
On the 737NG, the EEC limits the maximum certified thrust gained from data in the engine strut according to the airplane model as follows:
Aircraft Series Maximum Certified Thrust
737-600 CFM56-7B22 = 22,700lb.st
737-700 CFM56-7B24 = 24,200lb.st
737-800 CFM56-7B27 = 27,300lb.st
737-900 CFM56-7B27 = 27,300lb.st
Maximum Rated Thrust – This is the maximum thrust for the installed engine that the autothrottle will command. This is specified by the operator from the options in the table below.
Engine Aircraft Series Max Static Thrust (lb.st.) Bypass Ratio EGT Margin (C)
JT8D-7/7A/7B 1/200 14,000 1.10
JT8D-9/9A 1/200 14,500 1.04
JT8D-15/15A 200Adv 15,500 0.99
JT8D-17/17A 200Adv 16,000 1.02
JT8D-17R 200Adv 17,400 1.00
CFM56-3B4 500 18,500 5.0 90
CFM56-3B1 3/500 20,000 5.0 70
CFM56-3B2 3/400 22,000 5.0 50
CFM56-3C1 400 23,500 4.9 45
CFM56-7B18 600 19,500 5.5 145
CFM56-7B20 6/700 20,600 5.4 148
CFM56-7B22 6/700 22,700 5.3 150
CFM56-7B24 7/8/900 24,200 5.3 125
CFM56-7B26 7/8/900/BBJ 26,400 5.1 85
CFM56-7B27 8/900/BBJ 27,300 5.0 ?

Misc Photos

The left hand side of the CFM56-3. The large silver coloured pipe is the start air manifold with the starter located at its base. The black unit below that is the CSD. The green unit forward (left) of the CSD is the generator cooling air collector shroud, the silver-gold thing forward of that (with the wire bundle visible) is the generator, and the green cap most forward is the generator cooling air inlet.
The view into the JT8D jetpipe.The corrugated ring is the mixer unit, this is designed to thoroughly mix the bypass air with the turbine exhaust. The exhaust cone makes a divergent flow which slows down the exhaust and also protects the rear face of the last turbine stage.
The view into the CFM56-3 jetpipe.This is the turbine exhaust area, no mixing is required as the bypass air is exhausted coaxially.
There are two fan inlet temperature sensors in the CFM56-3 engine intake. The one at the 2 o’clock position is used by the PMC and the one at the 11 o’clock position is used by the MEC. The MEC uses the signal to establish parameters to control low and high idle power schedules.The temperature data is used for thrust management and variable bleed valves, variable stator vanes & high / low pressure turbine clearance control systems.
The CFM56-7 inlet has just one fan inlet temperature probe, which is for the EEC (because there is no PMC on the NG’s).A subtle difference between the NG & classic temp probes is that the NG’s only use inlet temp data on the ground and for 5 minutes after take-off. In-flight after 5 minutes temp data is taken from the ADIRU’s. The temperature data is used for thrust management and variable bleed valves, variable stator vanes & high / low pressure turbine clearance control systems.
The CFM56-7 spinner has a unique conelliptical profile. The first 737-3/400′s had a conical (sharp pointed) spinner but these tended to shed ice into the core. This was one of the reasons for the early limitation of minimum 45% N1 in icing conditions which made descent management quite difficult. They were later replaced with elliptical (round nosed) spinners which succeeded in deflecting the ice away from the core, but because of their larger stagnation point, were more prone to picking up ice in the first place. The conelliptical spinner of the NG’s neatly solves both problems.
The CFM56-7 tailpipe is slightly longer then the CFM56-3 and has a small tube protruding from the faring. This is the Aft Fairing Drain Tube for any hydraulic fluid, oil or fuel that may collect in there. There is also a second drain tube that does not protrude located on the inside of the fairing.
The JT8D tailpipe fitted as standard from l/n 135 onwards.The original thrust reversers were totally redesigned by Boeing and Rohr since the aircraft had inherited the same internal pneumatically powered clamshell thrust reversers as the 727 which were relatively ineffective and apparently tended to lift the aircraft off the runway when deployed! The redesign to external hydraulically powered target reversers cost Boeing $24 million but dramatically improved its short field performance which boosted sales to carriers proposing to use the aircraft as a regional jet from short runways. Also the engine nacelles were extended by 1.14m as a drag reduction measure.
The outboard side of the JT8D-9A with the cowling open.